Allen-Bradley 1770-M10 Manuel d'installation Page 32

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 75
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 31
System Start-Up
Chapter 4
43
14. Insert a 220V AC power cord into J19.
E
FUSE
PULL
Power cord location
If you are unfamiliar with micro-floppies, read appendix A before proceeding.
After you’ve connected your mass storage system, you’ve ready to begin
operations. make sure the POWER switch is at position 0. Perform the
following steps for your 1770-M10 system (Figure 1.16):
Figure 1.16
System
Startup Procedure for the 1770M10 System
1770-M10 Mass Storage System - Back View
Select position 1
Insert power cord
MASS STORAGE SYSTEM
Indicator lights green
M10
11972
1. Insert the connector end of the power cord into J19.
2. Insert the plug into the power outlet.
System Startup Procedure for
the 1770M10 System
Vue de la page 31
1 2 ... 27 28 29 30 31 32 33 34 35 36 37 ... 74 75

Commentaires sur ces manuels

Pas de commentaire